SAKAI REFINERY

Site Profile(as of June 2024)

Address3-16 Chikkoshin-machi, Sakai, Osaka
Start-upOctober 1968
Total area1,246,720 m2
Employees334 (as of March 31, 2024)
Capacity100,000 barrels/day
ISO 9001February 18, 1997
ISO 14001March 20, 1998

Images

SAKAI

Site Area

 1,246,720 m²

Capacity of Major Equipment

Topping Unit100,000 barrels / day
Vacuum Distillation Unit45,000 barrels / day
Catalytic Reforming Unit9,000 barrels / day
Reformate Splitter10,000 barrels / day
Naphtha Hydrodesulfurization Unit11,000 barrels / day
Kerosene Hydrodesulfurization Unit15,000 barrels / day
Gas Oil Hydrodesulfurization Unit17,500 barrels / day
No.2 Gas Oil Hydrodesulfurization Unit25,000 barrels / day
Vacuum Gas Oil Hydrodesulfurization Unit21,000 barrels / day
Hydrogen Producing Unit350,000 m3N / day
No.2 Hydrogen Producing Unit1,250,000 m3N / day
Fluid Catalytic Cracking Unit24,000 barrels / day
FCC Gasoline Hydrodesulfurization Unit14,000 barrels / day
ETBE Unit1,850 barrels / day
Alkylation Unit8,000 barrels / day
No.2 Sulfur Recovery Unit70 t / day
No.3 Sulfur Recovery Unit83 t / day
No.4 Sulfur Recovery Unit170 t / day
Tail Gas Treating Unit356,000 m3N / day
Gasoline Splitter7,600 barrels / day
Delayed Coker Unit31,000 barrels / day

UOP Coker Naphtha Distilate Unionfining Unit

42,000 barrels / day

Power Facilities

Boilers3 units128 t / hour
Steam Turbine Generator1 unit4,640 kW
Power Receiving Equipment4 units96,500 kVA
Co-generation Unit 17,000 kW
140 t / hour
No.2 Co-generation Unit 13,500 kW
23.6 t / hour

Oil Storage Facilities

Crude Oil Tanks8 units738,106 kl
Finished Product /
Semi-processed Product Tanks
87 units949,650 kl
Sulfur Tanks2 units2,400 kl
Asphalt Tanks2 units11,800 kl
LPG Tanks23 units44,580 kl

Port Facilities

Crude Oil Tanker Berth1 unit259,999 DWT
Loading / Unloading Piers7 units